GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. PACIFIC CHLORIDE GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple . Follow Figure 1 (page 4) for single phase input or Figure 2 and Figure 3 (pages 5-6) for three phase input transformers. Do not connect the next battery before you see indication OFF/FCA. Electric stacker battery charging considerations. UNC hardware provided in all four corners on top cover, markings on the door label and the unit nameplate must be revised, BATTERY WATERING OPERATION AND END OF CHARGE, Upload manuals that we do not have and get. Please read this manual completely and convey instructions to all, personnel concerned. Similarly when changing input voltage between 1) 208, 240, 480 VAC or 2) 380, 415VAC (three phase input) follow the schematics on Figure 2 or Figure 3 (pages 5-6) whichever is applicable. Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. They are designed to charge flooded lead-acid batteries only. d)If the battery is unplugged during charging, the charger will indicate OFF/FCA. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. All SCRFLX battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. To restart the charger, plug in the next battery. Home Delivery World will be held June 14-15 in Philadelphia, and brings together the worlds most innovative final mile delivery stakeholders and technologies that will revolutionize the eCommerce supply chain. Having trouble using the Discussion Forums? For battery sizes not listed, contact your local GNB service representative. | Contact Us
SPP PowrPak Series Industrial Battery Chargers. 8.2.3 AMPHR Release the UP or DOWN button to display the cumulative amp-hours returned to the battery as: [xxxx H]. Back to Lifting Platform. Incorrect re-assembly of the charger may result in an explosion, electric shock or fire. . Only qualified personnel should operate or service this equipment. All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. CAUTION: USE MINIMUM 75C WIRING. This website is best viewed in Internet Explorer 10 or above. Do not expose the charger to rain or snow. Operating Instructions and Safety Precautions for the EHF Series Charger, Only a t rained person should operate this equipment. h)This charger is factory set to charge flooded lead-acid batteries only. For proper connection, torque the screws to approximately 25 inch-pounds. Final details will not be available until the legislation is published in the EU Official Journal in July. they are displayed when no battery is connected. The DC charging cable has a commonly used battery plug or receptacle. GNB warrants that each new electric vehicle battery charger supplied by it, is of good workmanship and is free from any inherent mechanical defects, provided: 1.1The product is installed and operated in accordance with generally accepted industrial standards and in accordance with the printed instructions supplied with the charger. STONE, BRICK, CONCRETE OR METAL. European Parliament last week passed the new EU Machinery Regulation. NOTE:These options require different control cards per drawing 4120-65-68650-05 (see Appendix B, pages 2131). You are about to leave the Exide Global site. If the voltage at any location is incorrect, it can be determined that the transformer is faulty. Repair or clean battery lugs. Have the charger examined by a GNB service representative or local qualified service facility. Refer to Appendix A (on page 20) for a complete list of codes. 7.1 FAULT AND DISPLAY CODES. LIST OF DISPLAY INDICATIONS. any ideas Posted 5 Jan 2011 09:59 Discussion started by dan_selph California, United States Post a Reply Report this post Showing items 1 - 1 of 1 results. USE COPPER-CLAD ALUMINUM, ALUMINUM OR COPPER CONDUCTORS ONLY. They are factory set to charge sealed lead-acid batteries but it may be configured by a GNB service representative to charge flooded lead-acid batteries. If the battery is unplugged during charging, the charger will indicate OFF/FCA. All charger models with a Z, SCR100-XX-XXXT1Z OR SCR100-XX-XXXS1Z, can be stacked to a maximum of three high. To connect the input AC voltage, route the AC conduit through the knockout hole provided. To connect the input AC voltage, route the AC conduit through the knockout hole provided. 1. Connect or disconnect the battery plug only when the charger output is off; ALWAYS press the STOP pushbutton before unplugging the battery. A LCD display guides you through the charging operation, and high-visibility LEDs show charge status at a glance. Proper fuse ratings can be found in Table 2 and Table 3(see pages 9-12) for AC input fuses (F1, F2 in case of a single phase input or F1, F2, F3 in case of a three phase input). What are the commonly used batteries for AGV cars? The front panel has STOP, =, EDIT and INFO buttons. Have the charger examined by a GNB service representative or local qualified service facility. A red 'Fault' indicator lights if an abnormal charge indication is detected. Enter your email address and check your inbox. Testing has ensured that the, battery and c harger combination conform as a system for use in, Light and Heavy Industrial environments for each respective, product variant. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. Incorrect. The charger is used exclusively by the original user and by no other persons. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. Step 1: Check if the mains power supply has electricity and if the battery is under voltage. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. @Am V*pqA,g MHpMQ 2@$30R=@ S
All Rights Reserved. TABLE 2 - SINGLE PHASE RATINGS 9. They are designed to charge flooded lead-acid batteries only. The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. hb```@VB eahIphapb C 12.75 22.25 22.25 23.65 23.65 31.50 NOTE: Mining chargers are equipped with a drip cap and four lifting eyebolts for sling lifting. The SCR100 battery charger has an available watering control and end of charge option, in the form of a relay contact at terminals TB10-1 to TB10-2 (supplied for customer connection). TABLE 2 SINGLE PHASE TECHNICAL DATA STANDARD MODEL SCRFLX-XX-XXXX-S1Z DC AC AMPS @ AC VOLTS AMPS SCRFLX-06-260S1Z SCRFLX-06-475S1Z (50 Hz) SCRFLX-06-600S1Z (50 Hz) SCRFLX-06-865S1Z SCRFLX-06-965S1Z SCRFLX-09-475S1Z SCRFLX-09-600S1Z SCRFLX-09-865S1Z SCRFLX-09-965S1Z SCRFLX-12-260S1Z (50 Hz) 40 74 74 93 93 134 150 74 93 134 150 40 40 SCRFLX-12-475S1Z 74 (50 Hz) SCRFLX-12-600S1Z (50 Hz) SCRFLX-12-750S1Z SCRFLX-12-865S1Z SCRFLX-12-965S1Z SCRFLX-18-260S1Z SCRFLX-18-475S1Z Instr. 4.2 Battery with wrong number of cells connected to a charger. To restart the charger, plug in the next battery. FIGURE 1: SINGLE PHASE INPUT WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY 120 VAC CONFIGURATION (120/208/240V INPUT) BRN BLK L2 208 VAC CONFIGURATION (208/240/480V INPUT) BRN BLK L2 L1 208 VAC CONFIGURATION (120/208/240V INPUT) BLK L1 240 VAC CONFIGURATION (208/240/480V INPUT) BRN BLK BRN L2 L1 L1 L2 240 VAC CONFIGURATION (120/208/240V INPUT) 480 VAC CONFIGURATION (208/240/480V INPUT) BLK BLK BRN BRN L2 Instr. f)De-energize all AC and DC power connections before servicing this unit. The charger must be connected to either a single phase, or three phase 50 or 60 Hertz ( 2%) AC power source. less than 7Hz with good gain and phase margins. g)The charger is NOT for outdoor use. 7.2 Options 8. Primary switch contacts, fuses, bulbs, and filters are not warranted unless found to be defective prior to use. The charger has not sustained any transit damage. The charger is used within the published performance rating for the unit involved. ri0hG7?kuy&3kao=`#oJ^._0SSFO=hv0"4?GOGDRHD&?pI.\g\&JCn`@4[8w+3LL.2|?fi ?Of^jhRYhg`iz"{vpLL2_F8_RcY];u(itj{. The charger will automatically charge a battery per the Ah rating set at the factory. Figure 3 (page 6) applies to 12 cell 475, 600, 750, 865 Ah; 18 cell 475, 600, 750, 865, 965, 1050 Ah; and 24 cell 475, 600, 750, 865Ah chargers only. WARNING: DO NOT OPERATE THE UNIT WITHOUT PROPER GROUNDING. 8.0 CABINET OUTLINE/DIMENSIONS 13. D3E2-24-850B Exide Depth Charger showing codes C=04 & E=05 with connected battery and disconnected too.. HC Forklift America Corporation (HCFA), a wholly owned subsidiary of Hangcha Group, will discontinue its lead acid-powered product line. CHARGING LED DOES NOT LIGHT ON AFTER BATTERY CONNECTION Possible Cause Action 4.1 Connection between charger and battery open. Operating Instructions and Safety Precautions for the 2100LP & 2100HP Chargers Safety Careful consideration must be taken when connecting this charger to a generator. Add an additional 5.000 to the height. For battery sizes not listed, contact your local GNB service representative. Options . IMPROPER GROUNDING CAN RESULT IN THE RISK OF AN ELECTRIC SHOCK AND ELIMINATES CHARGER WARRANTY. corresponds to the voltage indicated inside the battery symbol on the LCD Display. 9.1.2 9.1 SCRFLX CHARGER FUNCTIONAL DESCRIPTION CHARGING 9.1.2.1 CHARGING LED This section gives a brief description of each LED, pushbutton, and the delay function on the SCRFLX type charger front control panel. b)Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. Installation must only be carried out by suitably qualified personnel, and in accordance with current local and national wiring, The unit should be positioned using lifting equipment, placed under, Battery leads should not be altered without prior consultation with, The charger should be sited in a cool, dry, well-ventilated location, away from corrosive fumes and humid atmospheres. Only connect the AC mains power supply (not connected to the battery DC), use the AC voltage of the multimeter, the black test pen is connected to the position of the screw pile head, the red test pen is connected to the lower right position, and the AC voltage should be about 28V, then Connect the red test lead to the position of the upper pile head (the black test pen position is unchanged), and the AC voltage should be about 28V. PAGE 2. It is a requirement to ground the chassis while the charger is connected to AC power. In the "OFF" position, the door can be opened but only AC power at the input of the switch is present while everything downstream is dead. 2. FIGURE 2: THREE PHASE INPUT WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY 208VAC CONFIGURATION (208/240/480V INPUT) L2 L1 L3 L2 L1 L3 240VAC CONFIGURATION (208/240/480V INPUT) L2 L1 L3 L2 L1 L3 480VAC CONFIGURATION (208/240/480V INPUT) L2 Instr. (Note: When the main circuit is charging, the circuit board is completely disconnected, the charging process is not controlled, it can only be counted as time charging test, and can not be charged for a long time). IF THIS IS NOT AVAILABLE, A FLOOR PLATE OF AT LEAST 1.43mm GALVANIZED OR 1.6mm UNCOATED STEEL EXTENDED AT LEAST 150mm BEYOND THE EQUIPMENT ON ALL SIDES MUST BE INSTALLED. After electrical connection is completed, the charger is ready for operation. Incorrect, UNC hardware provided in all four corners on top cover, markings on the door label and the unit nameplate must be revised, BATTERY WATERING OPERATION AND END OF CHARGE, Upload manuals that we do not have and get. Given that we're at LogiMAT in Stuttgart, Germany, it's no surprise that this week's news has some European flavour. Standby With the input supply connected and no battery, the charger will enter the standby mode. GNB shall not be obligated to reimburse the original user or any other person for any work performed. TABLE 3 - THREE PHASE RATINGS 11. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. Those who have not received electrical professional knowledge training may not allow the electric forklift charger housing to be opened for maintenance to prevent a safety accident. The relay closes thirty minutes after the charger reaches gassing voltage. INSTALLATION & OPERATING INSTRUCTIONS SCR FLX SERIES INDUSTRIAL BATTERY CHARGERS. The inspection and maintenance of the charger is very important in the daily use of the electric forklift. 4. EXCESSIVE EQUALIZING MAY DAMAGE THE BATTERY. The end user will have to install two separate push buttons to the appropriate terminals on the Remote Stop / Equalize circuit board (see schematic 4120-66-68650-50) and locate them to a. convenient location for use. United Kingdom. The charger should be permanently connected to the mains supply. 1. 3. Kalmar USA,
a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. endstream
endobj
startxref
9.0 SCRFLX CHARGER OPERATION LED DISPLAY DESCRIPTION (NONE) OFF FLd* PLUG IN THE BATTERY TO COMMENCE CHARGING CHARGER SET FOR FLOODED BATTERIES DELAY (Orange), dEL, then delay time remaining in Hours. 7. 7.2 OPTIONS. 9.1.7. - 36.5 50 31.5 16 FUSE 40 20 AMPS AMPS C.F. Subscribe Now to access
Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. 5 Jan 2011 09:59, Posted
Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input.
Masterchef Blind Chef Fake,
Edgewood Valley Country Club Menu,
Pure Capitalism Is An Economic System Characterized By,
Sugar Creek Country Club Membership Cost,
Articles E